There have been hundreds of photographs taken of the work-in-progress as the renovation of Vogrie Hall has progressed.
Here are just a few selected from those hundreds, to give a small taste of the massive task involved and a rough idea of the timeline.
A series of seven photographs showing the poor state of the inside of the building, photos by Alistair Taylor
A series of seven photographs as scaffolding goes up before work on the roof begins, photos by Alistair Taylor
A series of eight photographs showing the old tiles removed and being replaced by new roof lining , then temporary protection from weather, photos by Alistair Taylor
A series of three photographs, one from the outside showing the old boards, two from the inside after they have been replaced, photos by Alistair Taylor
A series of three photographs, showing tile batons being fixed in place ready for new tiles, photos by Alistair Taylor
A series of five photographs, showing a badly damaged wall head lintel undergoing repair, photos by Alistair Taylor
A series of three photographs, showing tiles stored prior to installation on the roof, photos by Alistair Taylor
A series of three photographs, showing tiles in place, photos by Alistair Taylor
A series of three photographs, showing completed roof, with tiles in place and solar panels too, photos by Alistair Taylor
Two photographs with builder's board and skip, photos by Alistair Taylor
Pavement view: builder's board and a full skip.
Side view of hired skip.
Two photographs showing temporary structural supports in place after internal walls are removed within the flat roof extension, photos by Alistair Taylor
Side extension intenal walls removed and temporary structural supports in place, opening up the small hall.
Temporary structural support in place after wall removed between small hall and the former Gents toilet.
Two photographs showing the extension internal walls removed and the floor and roof joists being exposed, photos by Alistair Taylor
Former ktichen and changing room internal walls removed.
Extension floor and roof joists being exposed.
Two photographs showing the main hall dilapidated ceiling removed, exposing the roof joists and trusses, photos by Alistair Taylor
View the length of the main hall roof space.
View of the roof space above the stage.
Two photographs showing the busy lobby work area and work progressing at pace in the main hall , photos by Alistair Taylor
View of the lobby as a base to work from.
Main hall, with insulation above ceiling and plasterboard being installed.
A series of three photographs of the extension, showing plasterboarding completed and plastering in progress , photos by Alistair Taylor
More to follow soon